Trainning Maximum Flow
Problems
Name | Solved / Tries | Average tries | Average tries to solve | |
---|---|---|---|---|
A | Maximum Flow | 2/3 (67%) | 1.50 | 1.50 |
B | Maze Movement | 2/6 (33%) | 2.00 | 2.50 |
C | Minimum Cut | 3/5 (60%) | 1.25 | 1.00 |
D | RA Duty Scheduler | 2/3 (67%) | 1.00 | 1.00 |
E | Jupiter Orbiter | 0/0 (0%) | -- | -- |
F | Moving Pianos | 0/0 (0%) | -- | -- |
G | Tomography | 0/1 (0%) | 1.00 | -- |
H | Waif Until Dark | 0/0 (0%) | -- | -- |
I | Avoiding the Apocalypse | 0/0 (0%) | -- | -- |
J | Budget | 0/0 (0%) | -- | -- |
K | The King of the North | 0/0 (0%) | -- | -- |
L | Transportation Delegation | 0/0 (0%) | -- | -- |
M | Minimum Cost Maximum Flow | 0/0 (0%) | -- | -- |