UTD-CB25-3
Problems
| Name | Solved / Tries | Average tries | Average tries to solve | |
|---|---|---|---|---|
| A | Atlögur | 1/1 (100%) | 1.00 | 1.00 |
| B | Cinema Seating | 1/1 (100%) | 1.00 | 1.00 |
| C | Flowery Trails | 1/1 (100%) | 1.00 | 1.00 |
| D | Stikl | 1/2 (50%) | 2.00 | 2.00 |
| E | ARMPIT Computations | 1/2 (50%) | 2.00 | 2.00 |
| F | Bolir | 1/1 (100%) | 1.00 | 1.00 |